Jedna sličica novog stadiona u Mainzu. Sređuje se prateća infrastruktura. Prototip malog, lijeog stadiona.
The technical data: Up to 14000 spectators find on to 11000
standing and 3000 seats hideout. „The wave “is to the playing field 136
meters long (to the holy spirit field 120 m), 27 meters highly, 32
meters low and goes over four ranks, whereby again back toward playing
field graduates itself upper ranks. Behind the seat range of the
Unterrangs withdrawn kiosk ranges for AFM, fan space/shop or the like
are intended.
„The doers “: The engineer's office for structural design OSD
under the direction of Professor Harald Kloft and the team of architects
of Hamburg creative laboratories „Interpol + “, the 2008 based was
developed and generally only client-independent projects. Responsible
person architect are Timothy Pape (Interpol+) and Lutz duke (workshop
2).
The idea: Evenly no PR-Gag or megalomania (the grandstand e.g.
is. 19 meters lower than the Munich alliance arena), as of critics
subordinates, but a rudimentary construction without Schnick Schnack
from the heart of a football fan see the responsible persons in their
project, which is to transport the myth Gegengerade into a recent time.
„The bribery at the basic form of the wave is the simple, elementary
form, those the basic needs of the football fans after large proximity
to the playing field, perfect view and common influence on the crews and
the play takes up “, thus Professor Harald Kloft of OSD of engineers.
„In the reason the draft is at the same time new and unusual, in
addition, astonishing simply and in its clarity basicfunctionally
developed. “The technical feasibility of the draft is from the beginning
ensured „“.
http://de.babelfish.yahoo.com/transl...C3%9Cbersetzen
[uredio riki_mo - 27. listopada 2011. u 20:57]